MIG/TIG WELDING
The welding of the several components is a fundamental process of the structural work.
Apart from the type of material to be joined, this procedure could be implemented with or without additional material.
Our production site includes 3 welding stations and 3 assembly stations.
After the careful preparation of the workpieces by the assemblers, thanks to the technical drawing, the pieces can be welded.
The welding is carried out, both manually and semi-automatically, using rotary table welding positioners (for circular welding) and longitudinal positioners (for linear welding).
Performed respecting the details requested by the client, using the respective WPS.
The welding phase is followed by the welding visual control and, if required, laboratory tests.
All the MIG welding machines (Metal-arc Inert Gas) have a synergic control of the arc.
In addition, there are 2 TIG welding devices (Tungsten Inert Gas) and one resistance welding machine.